Factsheet
- Factsheet Gasvessel – NAVALPROGETTI
- Factsheet Gasvessel – CHC
- Factsheet Gasvessel – CNGV
- Factsheet Gasvessel – ESTECO
Video
Poster/ Brochure
Newsletters
- GASVESSEL Newsletter issue 11 – July 2021
- GASVESSEL Newsletter issue 10 – February 2021
- GASVESSEL Newsletter issue 9 – November 2019
- GASVESSEL Newsletter issue 8 – July 2019
- GASVESSEL Newsletter issue 7 – February 2019
- GASVESSEL Newsletter issue 6 – December 2018
- GASVESSEL Newsletter issue 5 – September 2018
- GASVESSEL Newsletter issue 4 – July 2018
- GASVESSEL Newsletter issue 3 – May 2018
- GASVESSEL Newsletter issue 2 – February 2018
- GASVESSEL Newsletter issue 1 – December 2017
Publications
- Design Optimization, Cost and Risk Analysis of CNG Vessels Transportation
- Article in the Gasworld magazine
Reports
Work package 1: Project Management
- Download Deliverable D1.1 Consortium Agreement and Executive Board minutes of meeting
- Download Deliverable D1.2 Project Management Plan
- Download Deliverable D1.2 Project Management Plan Version 12
- Download Deliverable D1.3 Quality Management Plan
- Download Deliverable D1.5 Web-based Knowledge Manual
- Download 2nd Consortium General Assembly minutes of meeting
- Download 3rd Consortium General Assembly minutes of meeting
- Download 4th Consortium General Assembly minutes of meeting
- Download 5th Consortium General Assembly minutes of meeting
- Download 6th Consortium General Assembly minutes of meeting
- Download 7th Consortium General Assembly minutes of meeting
- Download 8th Consortium General Assembly minutes of meeting
- Download 2nd Consortium Executive Board minutes of meeting
- Download 3rd Consortium Executive Board minutes of meeting
- Download 5th Consortium Executive Board minutes of meeting
- Download 7th Consortium Executive Board minutes of meeting
- Download 9th Consortium Executive Board minutes of meeting
Work package 2: Scenario analysis
- Download Deliverable D2.1 Scenario Description and Characterization
- Download Deliverable D2.2 – Decision Support Model
- Download Milestone MS1 Letter of achievement
- Download Milestone MS2 Letter of achievement
Work package 3: Design of pressure vessels and pilot line
- Download the letter of achievement of the Milestone 3
- Deliverable D3.1 is confidential and is consequently stored in the confidential section of the website
- Download Deliverable D3.2 – Scenario Analyses performed with the Decision Support Model
Work package 4: Pre-industrial prototyping of pressure vessels
- Download Deliverable D4.: Test procedures on prototypes and experimental support tests with strain gauges to validation of the software simulations models (FEM analysis), safety factor validations tests
- Download the letter of achievement of the Milestone 4
- Download the letter of achievement of Milestone 5
Work package 5: Ship Design
Work package 6: Offshore and Onshore Gas Loading/Unloading Systems
- Download Deliverable D6.1: Technical proposals for the construction and equipment of a Loading / unloading modules
- Download Deliverable D6.2: Software tool for the design and operation of the loading / unloading facilities
- Download Deliverable D6.3 Sea State limit during loading/unloading operativity in various onshore/offshore operations
- Download the presentation by VTG during the technical meeting of WP6 in Athens on 10 January 2020
- Download the general report on design parameters and costs of onshore and off-shore loading and unloading systems
Work package 7: Cost – Benefit Analysis
Work package 8: Class Design Review – Safety Assessments
- Download Deliverable D8.1 Documentation providing safeguards solutions for the system as identified in the HAZID analysis
- Download Deliverable D8.2 Documentation providing a master hazard register and a framework for quantitative risk assessment
Work package 9: Exploitation and Dissemination